In this chapter
In this chapter
LOGISTICS PROCESS
- Receiving & Unloading
Text from figure
Vehicle
Check docs · Unloading · Quantity check · Record the result
arrival
Damage /
Claim
Discrepancy
- Sorting & Storing
Text from figure
Check and move to · Item and quantity
Sort items by zone · Storing
the location · check
※ Cross-Docking : Provide received items directly
Cross-Docking · Record the result
to customers without storing
- Picking
Text from figure
Check and go to the · Item and quantity
Prepare picking list · Picking
location · check
Record the result
- Packing & Shipping
Text from figure
Sort items by · Item and quantity
Packing · Record the result
customers · check
Shipping
OS&D
Text from figure
Types of OS&D
Wrong part · Defects · QTY Error Actual part that does not have a · Parts that has lostits original · Quantity of parts does not match matching part number results in · functionality and could cause · with accompanying document. losingits value. · quality problems.
Handling of OS&D Items
Documentation · OS&D Tag & Zone · Handling Record types, quantity, and · Place a tag and store it in a · Supplier Error : Claim to supplier reasons on the assigned · separate location. · Worker Error : Regularly scrap logsheet. · by each jurisdictional unit or
distribution center
※ OS&D : Overage, Shortage & Damage
PENDING PARTS MANAGEMENT
It is important to keep track of any delays from overall work processes in the warehouse.
- Purpose
- ① Preventing parts loss or damage
- ② Analyzing current causes of delay to prevent it from reoccurring
- Pending Parts Management
- ① Set a pending period limit considering each process capacity
- ② With respect to parts being over that limit, physically inspect and analyze the causes This must be done daily
- ③ Managers should always be aware of the pending parts and should be able to find them whenever they are needed
- ④ Regularly educate workers to prevent reoccurrence by recording and classifying pending history
- ⑤ In case of losing parts, consistent part management is necessary
- Major Errors
| Next Process | Case | How to check |
|---|---|---|
| Put Away | Omitting a report in computer after put-away | Check locations or next process |
| Picking | Omitting a report in computer after picking actual parts | Inventory picking locations or a packing standby site |
| Packing | Absence of Actual Parts - Omitting an actual picking after a report - Omitting a packing report after an actual picking Presence of Actual Parts - Omitting an actual packing after report - actual picking mistake or packing error | Inventory picking locations Open a box which is expected to contain actual parts Open a packing box Inventory picking locations and check quantity of box |
| EX-PDC | Omitting a report after container (Truck) loading | Inventory cargo ready box |
PRODUCTIVITY MANAGEMENT
- Purpose Productivity management is about putting parts in place to minimize working hours and warehouse employees so that the company reduces logistics labor cost.
- Productivity Standard Generally, Productivity (Lines per hour) = (Total shipped amount/lines) / (Total working hours) ※ There are many different management methods.
For example at MOBIS centers,
- ① Domestic center = Total (stored + ex-PDC) Amount Lines / Total working hours
- ② Export center = Total (stored + packed) amount lines / Total working hours ※ Most centers record daily and monthly results.
- Target Productivity Depending on the warehouse’s size, function, Layout, etc., the targets can be different. However, it is recommended that every warehouse assesses its productivity and establishes managing targets. Establishing the most appropriate target productivity is important.
- Improve Warehouse Productivity
- ① Schedule Planning The warehouse manager should plan the warehouse’s expected handling amount and corresponding working hours on a daily and monthly basis. As a result, the warehouse can minimize the unnecessary overtime hours of workers.
- ② Inventory Relocation The warehouse manager should regularly analyze the order frequency of every parts stored and relocate the frequently ordered parts to a zone near the working area and obsolete parts to the back of the storage facility. By doing that, the worker’s moving distance to pick a part can be greatly reduced.
- ③ The manager should continuously find out ways to rationalize the warehouse work procedures and reduce the worker’s working hours to improve productivity.
LEAD TIME MANAGEMENT
- Purpose Managing lead time enhances the level of service to customers and validates the warehouse operations efficiency. By managing and reducing lead time, the warehouse can reduce the field operations and increase the warehouse working area.
- Target The warehouse manager should determine which processes are critical to the warehouse operation and worth managing. However, it is recommended to manage following processes as below.
- ① Storing (from receiving to storage)
- ② Emergency Order Shipping (from order reception to shipping) ※ High priority
- ③ Regular Order Shipping (from order reception to shipping) After deciding which processes to manage for lead time, find out the current lead time level and establish suitable target levels for the current warehouse environment
- Calculations
- ① Inbound
- Average Lead time : Σ (stored date - receiving date) / Total stored lines
- Process Rate : Lines stored within target date / Total stored lines ( × 100%)
- ② Outbound
- Average Lead time : Σ (packed date - pick instruction date) / Total packed lines
- Process Rate : Lines packed within target date / Total packed lines ( × 100%)
※ The manager should pre-determine the target days for processing (e.g., 1 day, 2 days..)
- Reducing Lead Time Process
- ① Inventory Relocation Inventory relocation based on the order frequency not only enhances the productivity but also the efficiency by reducing lead time
- ② Maximize Cross-docking Ratio When receiving parts, the parts with customer orders don’t have to be stored in the facility By directly sending these parts to the shipping area, the warehouse can reduce the lead time
WAREHOUSE SAFETY
- Industrial Disaster
- ① What is an industrial disaster? A situation where worker at a factory gets injured, disease, or any other working equipment/facility breaks down
- ② Industrial Disaster Classification
- Nature-caused Disaster : Earthquake, Typhoon, Flood, Lightning, Drought etc.
- Man-made Disaster : Industrial Disaster, Traffic Accident etc.
- ③ Industrial Disaster Statistics In Korea, manufacturing and construction industry accounts for 68% of the total industrial disasters
- ④ Prevention
- Labor : Improve punctuality, assign tasks according to his/her abilities, conduct safety training and regulate uniforms
- Environment : Improve processes and promote an efficient but safe environment
- Man-made Disaster Prevention
- ① Worker’s Safety
- Before work, inspire worker’s awareness for safety by conducting safety education on a regular basis
- Prevent worker’s musculoskeletal disorders by conducting sufficient stretching and exercise before work
- Workers should wear all necessary safety gears at all times (Safety hat, safety belt, safety shoes)
- When working at a high place, make sure that the pallet or support is fixed firmly to a facility or equipment
- Organize workplace: Electric wire, hose, pipe etc.
- Keep the workplace clean by preventing water or oil spills
- Pay attention to stacked products with possibilities of falling
- Pay attention to fork lifts when it is in contact with racks, bins and others
- Install fire extinguishers and check them regularly
- Prevent electrical fires by checking older wires
- When handling inflammables, avoid fire hazards
- Check battery chargers and circuit breakers regularly
- Prevent electric shocks when facilities are flooded
- ② Warehouse Equipment Safety
- Only designated licensed drivers should operate equipment
- Prevent equipment from rollovers, respect the equipments’ limit capacity. Don’t overload!
- When driving backwards, activate the rear alarming device. Look behind and make sure the pathway is clear and then drive slowly
- On rainy days, drive equipment even slower since the braking distance is longer. Avoid braking suddenly when you transport material
- Before leaving the equipment, pull the parking brake and remove the keys
- Natural Disaster Prevention
- ① Flood
- Repair weak part facilities which might be destroyed during a flood
- Mend the waterways which are clogged, check stone embankments, install signboards to caution against dangerous areas, objects and equipment, etc...
- Prepare for emergencies by installing a water pump and check it to make sure it works properly
- Prevent products from becoming rusty by planning ahead of time
- ② Typhoon
- Since power failures and water shortages frequently occur during typhoons, prepare additional power supplies, radios, lanterns, batteries etc.
- Reinforce (secure) windows with veneer or plywood
- Bind products stored outside with wire or rope and rearrange stacked items into a single level
- ③ Heavy Snow / Freezing
- Remove snow stacked on and around the facilities and building
- Pay attention not to slip or rollover equipment when working on a slippery surface (snow and ice)
- Prepare a box with sand and/or calcium chloride and sprinkle over slippery surfaces around the facilities and especially on ramps
- Vehicles and other equipment should have necessary winter commodities such as snow chains and anti-freezing solution
3R 5S
- What is 3R
Text from figure
Right · Right · Right
3R
Parts · Place · Quantity
- What is 5S
Text from figure
5S
Sort · Set in Order · Shine · Standardize · Sustain
- ① Sort : Remove unneeded items from working areas
- ② Set in order : Needed Items can be easily found, stored and retrieved
- ③ Shine : Keep everything clean and swept
- ④ Standardize : The creation and use of procedures, practices, policies, and job aids associated with above 5S activities
- ⑤ Sustain : Stay trained, make it a habit and permanent practice
- Basic Concept of 5S
- ① The basis of production activity
- ② Prevent all loss and malfunctions in advance
- ③ Participation and practice of all personnel is essential for 5S
- ④ Makes the working space larger
- ⑤ Improve quality and achieve zero defect
- ⑥ It enables cost reduction and supply of parts within specified deadlines
- ⑦ Prevent safety accidents and reduce malfunctions
- ⑧ To make the relationship smooth and improve the willingness to work
- ⑨ A small improvement is also followed by a great effect if accumulated steadily
- 5S Activity - Sort
Separate needed item from unneeded items and removed unneeded items form work area.
Separate needed items from unneeded items Remove unneeded items from working areas
- including non-confirmed parts, empty pallet and damaged boxes, etc. Remove all excess items from working areas
- including consumables, supplies, personal items, tools, devices, and equipment Target Area : Warehouse, office, PDA cabinet, storage place for consumables, equipment and tools, etc.
- 5S Activity - Set in Order
Make it easy to find what you need and keep it in place
- Anyone can find & use easily
- Anyone can understand 3R - right part/item, right place, right quantity - easily
Signage, identification tag, Labeling
- Office, location, process area(inbound, outbound, pigeon hole and etc), zone, safety signage, charging area, consumable storage area, quality control and so on Line marking (Painting Line)
- Parts storage area(floor), forklift staging/charging area, waste bin, fire related, pedestrian passage, inbound/outbound area and so on
- Different color for each area - passage, storage area, working / staging area and so on Following 3R - Right Part/Item, Right Place, Right Quantity
- Part, consumables(including package material), PDA, cart and other tools and equipment Visible Management
- Enhancing visualization and transparency, which allow anyone to see the abnormalities and changes at a glance and to take countermeasures quickly Easy to understand and clear
- 5S Activity - Shine
Create a working environment free from any trash and dirt, by sweeping, cleaning, and removing dirt, dust and debris from the floor, equipment, fixtures, tools, etc. of the whole warehouse.
Designate workers in charge of cleaning, by warehouse area and items to be cleaned
- Attach “Designated worker” tag to each cleaning area Keep cleaning tools in operation
- Place tools near cleaning area neat and tidy Managing cleaning schedule and Check list
- Daily cleaning is basic, but by running “Clean day” a week, focus on detailed checking and improving Fix problems that are found while cleaning facilities, floors and equipment
- 5S Activity - Standardize
Keep it clean by repeating "Sort", "Set in Order" and "Shine”.
The creation and use of procedures, practices, policies, and job aids associated with the first 3 of the 5S activities Promotion - newsletters, posts, slogans, badges etc. Motivation - ideas contests, 5S days, warehouse tours, snap shots Evaluation - issue warning tickets, top managers visits, check sheets, public recognition Always check with eyes, find loss (defects) easily, and keep clean
- 5S Activity - Sustain
Stay trained about “Standardize”, make it a habit and permanent practice.
Create and maintain favorable 5S atmosphere in the workplace Create 5S culture Make workers well-disciplined and familiar with manuals and how to work, let them act & improve on their own Evaluate periodically with a check sheet and proceed with improvement activities Point out the disruption of 5S on the spot and induce improvement
- Example of 3S 5S
Text from figure
Assign designated workers to each area · Daily training for workers
Daily 3R 5S activity after training · Periodical inspection by top management
Signage for each area · Signage for inbound area
Text from figure
Pedestrian Passage in different color · Inbound sorting area (for pallets)
Forklift parking area · Charging area
Small steel parts storage using divider · Molding / Hose parts using paper tube
Text from figure
First In First Out
Year 11 12 13 14 15 16 17 18 19 20 21 22
Code W X Y Z A B C D E F G H
Month 1 2 3 4 5 6 7 8 9 10 11 12
Code A B C D E F G H I J K L
“Yellow Zone” for shelf-life parts · Attaching colored stickers based on with FIFO sticker · receiving year
Secured Area with lock for valuable Parts · “Picking Error” sticker for parts
with frequent error
Plastic Location label in floor area · Set in order for tools
- Example of Improvement
Before · After
Example
Before · After
Example
Before · After
Example